If you need to have any information or samples, remember to contact us and you will have our quickly reply. Owing to our extensive product selection and prosperous ordeals in this sector, Our technicians and engineers have 23 years of Expertise in the Bearing Sector.
AMD-P Platform CNC Punching EPTT
one. EPTT computer numerical manage program, EPTT company deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment numerical management processing application, can accomplish the discipline programming, backstage programming 19 inch brand name Lcd check, the photograph is far more very clear and gorgeous Software practical procedure, bring their own mould library administration, can determine CAD drawings immediately make CNC code, and understand the automatic programming, computerized feeding, automatic stamping, higher velocity, higher precision.
two. Adopts our firm impartial analysis and deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment the in-line arrangement die-set, can comprehend the automated modifying mould, match the internationally utilised stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd mould and easy to adjust.
three. Servo motor, linear XiHu (West EPT) Dis.Hu (West EPT) Dis. rail, ball screw, coupling and pneumatic components and EPT areas ended up EPTTed brand name. To make sure the EPTTs’ accuracy and balance
four. Use centralized lubricating technique, computerized return oil, ball screw , XiHu (West EPT) Dis.Hu (West EPT) Dis. and other significant EPTT parts are f centralized lubrication, proEPTT the EPTTs’ service life.
Specification | Unit | AMD-P10 | AMD-P20 | AMD-P25 | AMD-P30 | AMD-P35 |
Punch Power | KN | In accordance to the urgent power JCEP to approach the sheet | ||||
Processing sheet thickness | mm | le6 | ||||
Processing sheet dimensions |
mm | a thousand*1000 | a thousand*2000 | 1250*2500 | 3500*1250 | 3500*1250 |
Punching Frequency |
hpm | one hundred fifty | ||||
Sheet Moving pace | m/min | forty | ||||
Hole Precision | mm | plusmn0.one | plusmn0.one | plusmn0.1 | plusmn0.1 | plusmn0.1 |
Voltage Score | V | 380 plusmn5% | 380 plusmn5% | 380 plusmn5% | 380 plusmn5% | 380 plusmn5% |
Prower Ranking |
KW | two | 3 | three.5 | 4 | 4.five |
EPTT Bodyweight |
T | 3.3 | four.2 | 5 | 5.8 | 6.2 |
Advantage:
one. Labor-saving: run and feed feeding immediately , automatic calculate time.
two. Computing time-conserving: realize the conversion approach about the CAD graph automatically.
three. Positioning time saving: pneumatic gripping,EPTTful,no line deflection.
four. Replacing moulds time conserving: utilizing the configuration of convenient changing moulds.
5. Increase productiveness: in contrast with common punching EPTT,the CNC punching EPTT with ninety five-100min Stamping frequency which increase the effectiveness.
6. Improve the ratio of basic safety: the EPTT functions routinely, which can place an finish to protection incidents.
1 | Reply your inquiry in eight functioning hrs. |
2 | Knowledgeable staffs reply all your concerns in time. |
three | EPTT style is accessible. |
4 | Exclusive and EPT resolution can be presented to our consumer by our professional engineers and workers. |
5 | EPT low cost and security of income are supplied to our distributor. |
6 | We are expert company of CNC Punching EPTT. Have a expert design group with much more than 10 years layout encounter engineers, aggressive with excellent quality |
7 | As an truthful seller, we constantly use exceptional raw material, EPTd EPTTs, expert technicians to make certain our products to be concluded in high top quality and steady attribute. |
8 | Prompt supply, internet site set up and commissioning. |
EPT Information:
MOQ: 1set.
Settlement Forex: USD, RMB, EUR.
EPT method: FOB (FCA), CIP, CFR, CIF, DDU, DDP, Turnkey.
Payment time period: thirty% deposit by T/T, the equilibrium paid before shipping or L/C at sight.
Delivery time: Within fifteen-forty daEPTTaccording to different kind EPT steel stamping push EPTT.
Right after-sale provider:
1. Set up and commissioning issue of CNC punching EPTT: We will send one-two experts to assist with EPTT set up and commissioning, customer paEPTTfor their tickets, resort and diet program. Client need prepare set up EPTTry and instruments.
2. Warranty time:twelve months from day of commissioning completion, but no much more than 18 months from day of supply.
three. EPT complete english paperwork: incXiHu (West EPT) Dis.Hu (West EPT) Dis. EPTT installation drawings, pit style drawings, handbook e-book, electric wiring diagram, electrical handbook guide and servicing guide, etc.
Any query pls make contact with with us and welcome to go to our manufacturing facility.