We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 different branches. For a lot more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
15 kw energy motor 18 l/min flux electric powered tower concrete inserting increase for pouring concrete
Tower Column hydraulic jack-up concrete placing boom, Self-climbing type, climbing by flooring body or by shaft frame. Largely used for concrete placing of construction undertaking, which includes civil construction, plant construction, bridge development, beam lawn, nuclear electricity plant, infrastructure, and so on.
Charactics
Modular layout, mechanical and electrical integration control, folding growth, tube column, floor body and shaft frame. Integration of advanced features and solution diversification, to achieve a greater product portfolio, improve the applicability of the merchandise.
Imported hydraulic and electrical elements, undertake quality fa EPT coupling for hydraulic pipelines, which is converted swiftly, it can efficiently fix the difficulty of oil leakage in the procedure of assembling and dismantling, and stay away from the pollution of the atmosphere. Safety and trustworthiness
sections R variety hydraulic boom, large round arc, novel and stunning look, compact framework, and the light-weight layout of the growth, which decreased the excess weight of the whole device..
Straightforward to transportation and put in.
Outfitted with self-climbing frames which are driven by hydraulic and which climb up automatically from the current flooring to the sought after floor together the holes at first ready in elevator effectively, the placing booms increase with the increasing floor, conserving time and labor.
Characteristics
A.Growth
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, ensuring excellent and reliable quality.
B. EPT method
C series products adopted Germany Rexroth solenoid directional control valve and balance valve
with secondary overflow. It has effectively avoided the potential damages of boom
which might be caused by over speed movement when the boom drops down, and sudden
increase of oil cylinder’s pressure under external forces, thus the reliability of the boom
has been increased.
C.Interior EPT Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big
convenient for installation, dismounting and maintenance, which ensure longer service
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing System and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with
a great torsion. Being accompanied with the integrated slewing balance valve made by
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wireless Remote Controller
C series products adopt industry-exclusive analogue wireless remote controller made by ZheJiang TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.Electrical Control Program
The electric control system adopted world famous brand of electric components, such
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system’s reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.
Alternative:
u Inner-climbing frames: Flooring frames or Wall frames(Shaft frames)
u Column: 2m-10m.
u Mode of slewing: Equipment slewing or rack & Bearing of stepless slewing.
u Voltage: 380V/50Hz or 440V/60Hz
u Radio distant Handle: Tele Crane HBC or AUTEC
29m Tower Jack-up Concrete Placing increase Technical specs:
Model | Units | HGY29C | ||
Performance | Max.radius of placing boom | m | 28.nine | |
Freestanding top (to the joint among the stop of the boom and swivel table) | m | 22.seven | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | constantly near | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total excess weight | kg | 19100 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-4 | |
Power | kW | 11 | ||
EPT technique |
Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM sixty eight | |
Circumstance temperature 5ºC-35ºC | / | L-HM forty six | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control mode |
/ | Limited-haul Manage /radio remote handle | ||
Pipeline cleansing | / | Moist cleaning/Dry cleaning |
||
Structure of tower entire body | / | Tubular column | ||
Section of tower body | m×m | .75×0.75 | ||
Boom |
Shape | / | A few hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT area | Size | m | eleven.5 | |
Articulation | ° | 0°~82.5° | ||
2nd part | Length | m | nine.three | |
Articulation | ° | 0°~180° | ||
3rd area | Duration | m | eight.1 | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing method | / | By hydraulic cylinder climbing |
|
Interval of climbing | m | .fifty two | ||
Floor frame | / | Gap prepared in ground |
||
Shaft frame | m | Gap well prepared in flooring two.~2.7 |
||
Min.Interval of climbing frame | Climbing | m | three. | |
Placing concrete | m | 6. | ||
Rest | m | 6.0 |
29m Inserting BoomWorking Assortment :
33m Tower Jack-up Concrete Positioning increase Technical specs:
Model | Models | HGY33E | ||
Performance | Max.radius of putting growth | m | 33 | |
Freestanding peak (to the joint among the stop of the growth and swivel desk) | m | 22.seven | ||
Boom articulation | ° | four hundred | ||
Slewing brake | / | always shut | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total bodyweight | kg | 21200 | ||
Counter fat | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor |
Model | / | Y2-160L-4 | |
Power | kW | 15 | ||
EPT method |
Pressure | MPa | thirty | |
Flux | l/min | 18 | ||
EPT oil |
Circumstance temperature 35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC | / | L-HM 32 | ||
Control manner | / | Short-haul Management /radio distant manage | ||
Pipeline cleansing | / | Moist cleansing/Dry cleaning |
||
Structure of tower body | / | Tubular column | ||
Section of tower entire body | m×m | .75×0.75 | ||
Boom |
Shape | / | Three hydraulic foldable arms | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1 EPT segment |
Length | m | twelve.38 | |
Articulation | ° | 0°~82.5° | ||
2nd segment | Duration | m | 10.93 | |
Articulation | ° | 0°~180° | ||
3rd segment |
Size | m | nine.sixty nine | |
Articulation | ° | 0°~180° | ||
Climbing |
Climbing method | / | By hydraulic cylinder climbing | |
Interval of climbing | m | .fifty two | ||
Floor body | / | Hole prepared in ground | ||
Shaft frame | m | Gap prepared in floor two.~2.7 |
||
Min.Interval of climbing frame | Climbing | m | three. | |
Positioning concrete | m | 6. | ||
Relaxation | m | 6.0 |
33m Putting BoomWorking Variety :
Tower Column Concrete Putting Growth Installation:
Tower Putting Growth Occupation web site Efficiency:
We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 different branches. For far more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of authentic gear manufacturer’s (OEM) component figures or emblems , e.g. CASE® and John Deere® are for reference purposes only and for indicating product use and compatibility. Our business and the shown alternative components contained herein are not sponsored, approved, or produced by the OEM.